This project encompasses multiple sites along the coast. SgurrEnergy carried out the following:
SgurrEnergy acted as technical advisor for this 120MW project, located off the coast of the Netherlands, on behalf of a consortium of lenders. We performed the energy yield due diligence and carried out a technology assessment. We also carried out an analysis of long term wind speed trends to get the long term picture for the life of the wind farm and concluded the work with a quantification of the risks. We are ideally suited to carry out these responsibilities as we are 100% independent and provide sound impartial advice based on many years experience.
These two adjacent wind farms are currently under construction, with completion expected in 2008. This 180 MW project is sited 5km off the Lincolnshire coast, east of Skegness. SgurrEnergy advised on availability and accessibility issues and conducted the due diligence of the energy yield.
Kentish Flats offshore 30 turbine wind farm project became fully operational in September 2005. SgurrEnergy provided technology due diligence and energy yield due diligence to this 90MW project located on a large, flat and shallow plateau just outside the main Thames shipping lanes.
© SgurrEnergy Ltd. Registered Office 79 Coplaw Street, Glasgow, G42 7JG. Tel.: +44 (0)141 433 4646
Registered in Scotland No. 245814 Vat No. GB 797 0474 85